Monday, September 28, 2009

Galashiels, and the MSA

Second item first... I've been invited onto the MSA Off Road committee.

The MSA is
"recognised as the sole motor sport governing body for the United Kingdom by the world governing body, the Federation Internationale de L'Automobile (FIA).

As the governing body, the MSA is responsible for the governance and administration of all major forms of motor sports in the UK."


In practice, this means I will need to go down to the MSA's offices three times a year (the offices are five miles from Heathrow airport, so there's no difficulty in getting down.) We'll reserve judgement on the interaction between my informal style and the MSAs panchant for shirts and ties, however the role does place me at the centre of Cross Country motorsports here in the UK.

Refering to Galashiels: I was down there on Sunday with Tom, Tony & Martyn, and we have put in the third crossing.

----------- blurb -----------------
Galashiels.

The last round of the SCCC is upon us, and the event promises to be a cracker.

A small team of hard-working enthusiasts has been down and put in the final crossing, opening up the first field for use again - giving us a course in excess of 5 miles! (and the whole route has been driven - in a ladened Discovery, on road tyres)

Starting close to the service area, the first half mile is old-school: diving through a bomb-hole almost immediately after the start line, the course weaves through the whins, before curling up and around to plunge through a gate and into the Rig'n'Furrow field. A large loop to the left then nip round the back of the watertank to the top-right corner of the field, a loop back to cross a culvert and then into the Valley Field. Slip anti-clockwise round the pond and swoop around the Wall Of Death. A grapple handfull of steering wheel as you slide round and hurtle up to take on the Dips: ram it into overdrive and power down into the dip, feel the suspension bottom out as you ride up the far side. Throw the car into the nick at the back of the field, then haul it round to head back to the dips for a fast exit towards the quarry.

Choose your line: high or low... the center is so *not* an option.

Stand on the brakes before swinging around the quarry, then arrow out the far track. Hairpin around the Lonesome Pine and charge back up the field into an open right hander through the trees. Swing round the power poles and open up to the long run beside the old golf course...
be beware of the furrows: keep to the racing line or face a very rough ride!

The route disappears into the trees, hairpins, and then ejects you into the openness of Blaikie's Hill. Out through the gate opposite, and nip through the bracken to pick up the old track. Pull right at the next gate and down a step to the hairpin at post 12 where you pick
up the track again. A powerblast round (but watch for the hole, you *will* go air-born of you hit it at speed), then full-on towards the old forest.

Loop out to the right and head back, driving around the rocks, not over them!

Drop back into the Valley Field and hard right then sweep left to take the gate back into the Rig'n'Furrow field. Right again to a wide and lazy corner down to the far end of the field before looping back up to cross above the spring. A rolling drive down to the first wooden
bridge, through the next gate, and left to the second bridge. Now it's just a series of shallow climbs back towards the finish.

----------- /blurb -----------------

It should be a great end to the year!

Wednesday, September 9, 2009

SCCC 2010 meeting

I'm organising a meeting for the main movers'n'shakers in the Scottish Cross Country Championship.

I've already booked the dates with the MSA (well, the Cross Country Committee within the MSA)

My agenda is:
1) Officials: CofC; Chief Marshal; club reps; stewards

2) Dates & venues:
* SCCC Round 1: 14 March. New Galloway (maybe - the owner got upset at some of the road conditions back in August)
* SCCC Round 2: 18 April. Fife
* SCCC Round 3: 15/16 May. Drumclog
* SCCC Round 4: 20 June. Coulport
(Perthshire Hill Rally: 9/10 July)
* SCCC Round 5: 21/22 August. Bathgate
* SCCC Round 6: 12 September: TBC
* SCCC Round 7: 18 October: Galashils
(Borders Hill Rally: 27/28 November)

3) Thoughts from the Field:
* Team entries (2 drivers, 1 car, 1 position)
* More weekend events, fewer one-day events
* Joint events with NORC/AWDC/etc (such as Drumclog or Forrest Lodge)
* Rescue/Recovery.... plus doctor? (for the likes of Dan L./John C.)
* ??

4) Alterations to the SSRs

5) Registering the events in the MSA calendar

6) AOCB

Tuesday, September 8, 2009

So much has happened

Why the long hiatus? Lots of reasons.

The Perthshire took over my life for a while.... a long while. It was a learning experience, and I've learnt that I'm not a good event organiser. I'm good at encouraging people, and supporting them. I'm pretty good at designing courses. I'm not bad at drawing maps.... but organising stuff? no.... I just have stress breakdowns instead.

Drumclog was also a low-point, professionally speaking: I lost the rag with some competitors, and almost walked away from the whole scene.

Running the Perthshire was saved by Andy: he took over and kept everything on-track.
The event happened: it took some slightly underhand manouvering; some pretty blunt prodding; a bit of outright bribary; and a lot of self-sponsorship..... but it happened.

For a while, the BCCC was going to renege on the agreement I had with them, but that was averted (I was asked to keep shtum on that, and I am doing so)

The night-comp at Bathgate happened... though there was an attempt to move it to a more day-oriented event: so that wouldn't be a night-comp then?
There were several slightly hairy moments where people were getting stuck left, right, and center... and then John blew the bogie time out the water: 7'45" for a bogie time of 8'30" (why do I always react badly when he demands something from me?)

The Borders Hill Rally is now being oreganised, but not my be... by Rupert from Castle Rescue.

The Dunbar comp has been cancelled for the second year in a row. I think we need a new site for September - one not held hostage to rain & delayed harvests.

Thursday, March 26, 2009

More Perthshire stuff

Yesterday was 167 miles around Perthsire - some good meetings, some not so good.
None specifically bad, which is always a bonus.

Tonight has been creating maps & writing contracts... and failing to make phone calls.

Tuesday, March 24, 2009

The high's and lows of planning events

Life, it seems, is fractal: things repeat & reflect on both a micro- and macro-scale.

For example, I've been having huge issues trying to sort out land for the Perthshire Hill Rally: defra have passed some concerns on one farm; and npower's wind-farm has taken out an entire farm (one which was pretty central role in the event too!)

Thinks were looking bleak.

But now I've got three new contacts to speak to... some new bits of land to look at, and maybe the rabbit can be pulled out of the hat :)

Tuesday, March 17, 2009

SCCC Round 1 results

Round 1: Forrest Estate - Dumfries & Galloway

Drivers NameComp NumberLap 1 Lap 2 Lap 3 Lap 4 Lap 5 Lap 6 Lap 7 Total Time
Colin Gould 34 00:11:52 00:12:51 00:11:15 00:11:35 00:11:18 00:11:13 00:11:02 01:21:06
Brian Carlin 10 00:12:11 00:11:58 00:11:32 00:11:16 00:12:10 00:12:09 00:12:14 01:23:30
David Bartlett 22 00:12:43 00:12:41 00:11:39 00:11:47 00:12:02 00:12:09 00:12:33 01:25:34
Tony Rae 11 00:13:08 00:12:30 00:12:00 00:12:27 00:12:12 00:12:06 00:12:10 01:26:33
Malcolm Millar 21 00:14:44 00:11:52 00:11:56 00:11:57 00:12:17 00:12:03 00:11:59 01:26:48
Robin Vance 35 00:12:47 00:12:35 00:13:21 00:12:29 00:12:42 00:13:01 00:12:31 01:29:26
Stu Howe 4 00:13:56 00:13:29 00:12:53 00:12:55 00:12:32 00:12:47 00:12:30 01:31:02
Peter Baird 19 00:13:32 00:13:36 00:12:54 00:12:55 00:13:01 00:12:56 00:12:50 01:31:44
Euron Williams 25 00:13:11 00:13:11 00:12:40 00:12:46 00:13:40 00:13:38 00:22:26 01:41:32
Billy Phillips 2 00:30:00 00:12:54 00:13:18 00:13:49 00:14:14 00:13:45 00:14:24 01:52:24
Lee Bartlett 5 00:30:00 00:12:39 00:11:49 00:11:25 00:11:37 00:11:27 00:30:00 01:58:57
Dan Lofthouse 13 00:30:00 00:10:30 00:10:33 00:10:11 00:09:59Engine troubles DNF
Brian Hilditch 7 00:30:00 00:13:50 00:30:00Broken GearboxDNF
David Mitchell 6 00:16:28 00:30:00Parked in a ditch DNF
Johnny Drysdale 3 00:22:40Engine troubles DNF
David Drysdale 18 00:30:00Parked in a ditch DNF
Robert Law 16 00:30:00Broken Gearbox DNF
Colin Stevenson 37Gearbox problems DNF
Double Driven

John Cockburn &
Greg McLeod

- 00:12:43 00:11:18 00:11:34 00:10:23 00:11:17 00:10:25 00:12:56 01:20:36
Paul Myers &
Matt Morgan
- 00:35:12 00:12:46 00:30:00Parked in the trees DNF

 

Tuesday, March 10, 2009

Scurrelous rumours and mis-factual information

Fact 1: The Perthshire Hill Rally is still on: I am talking to land owners and planning options and juggling costs. I do not want to be the man who killed the event... it will run!

Fact 2: I (on behalf of the Scottish Hill Rally) have been talking to Selwyn about the BCCC and the Hill Rallies. There will be a Hill Rally, and I am working on backup plans
(edit: Borders Hill Rally)

Fact 3: SHRC and BCCC can work together. This is what the position is, as far as I am aware:
BCCC are going to provide a gap in the BCCC calendar so that drivers who wish to enter the Perthshire have a free rein, and do not feel constrained to committing to enter due to a BCCC round before-hand (basically, nothing from the BCCC round at the beginning of June until the end of July.)

To confirm our (my) position vis-a-vis the Borders:
I would prefer a straight Scottish Borders Hill Rally, as we normally run: multiple stages, at most driven twice without alteration; distinct "stage miles", "road miles" (though there is no public highway road miles); service.... using timecards, roadbooks, and strict time-keeping... and no distinction between Hill Rally drivers and BCCC drivers.


This would be the simplest interpretation of the concept "The July round at Castle O'er has been dropped from the BCCC calendar to be replaced by the Borders Hill Rally"

What I believe we have on offer is a compromise from there:

The event will be a Hill Rally, run to Hill Rally timing. BCCC will buy into the event.
The BCCC competitors would drive fewer stages... but still something in the order of 60 miles.
The Hill Rally entrants (either non BCCC people paying the standard fee, or BCCC people who "upgrade" at their own cost) will drive more stages... in the order of 90 miles

SHRC will set up the event such that a BCCC driver can return to service after every lap (noting that the "super-rally" rules would give them a maximum for the stage missed, but keep them in the event)


This is a public note - for the record...